Infrastructure Asia 2010

(Jakarta, 14-17 April 2010)
Kementerian Perhubungan menawarkan 30 proyek 30 proyek infrastruktur dalam jangka waktu 2010-2014 pada Infrastructure Asia 2010 Asia Pacific Ministerial Conference (APMC) on Public Private Partnership (PPP) for Infrastructure Development. (International Expo).

Print
PDF

PELABUHAN PANTOLOAN

Jln. Pelabuhan No.23, Palu, Sulawesi Tengah

Tlp. (+62-451) 491815

Fax. (+62-451) 491081

 

Position

00° 42’ 03” S / 119° 51’ 03” E

 

No. of Map

Map No. 175

 

Anchorage

00° 43’ 00” S / 119° 51’ 00” E

 

Local Time

GMT + 8 hours

 

Max. Size

Max draft 9,5 m

 

Operational Time

Open 24 hours, even in holiday. Tides do not effect to entry, but must be carefull because many fisherman activity in the areas.

 

Documents

Documents needed by the port or other institution:

12 copies Passenger list

6 copies Crew list

2 copies Customs Documents

2 copies Health Documents

6 copies Cargo Manifest

6 copies Bills of Loading

5 copies Ship’s Paper

Sailing Permit

 

Radio

Pantoloan Coast Radio Station, call sign PKM 44 operates 24 hours Freq. 2182 Khz, 6215 KHz, 8291 Khz Channel 16 or 70

 

Weather and Climate

Tidal

Top High                          : 2 m LWS

Average High                  : 1 m LWS

High High Water Spring : 2.4 m LWS

Mean Sea Level              : 1.2 m LWS

Low Low Water Spring   : 2 m LWS

Chart Datum (LWS)        : 0.0 m LWS

 

Current

Maximum Speed : 0 knot

 

Wind

Maximum Speed : 0 knot

 

Temperature

Average : 33° C

Variate : 28° – 34° C

 

Hydro Oceanography

Navigation Channel

Length of channel : 12 Mile

Width of channel : 150 m

Min. depth of channel : 11 m

Max. depth of channel : 40 m

Bottom of sea : sand/clay

 

Basin

Square Area : 200 Ha

Min. depth of Basin : 9 M

Max. depth of Basin : 13 M

Max. depth beside

of Wharf : 9 M

 

Facilities

Berth

Pangkalan 1 pier; length 250 m, depth 20 m (Pantoloan)

Pangkalan 2 pier length 120 m , depth 20 m (Donggala)

 

Towage

Available to assist in berthing and unberthing by 1 unit

Tug Boats Anggada VII 1 x 800 HP

 

Pilotage

Compulsory. Apply for pilot boat by calling Pantoaloan Coast Radio Station on Ch. 12 or raising “G” flag. Entrance in all season and weathers. Palu bay are suaitable for anchorage to awaiting pilot boat. Pilot boat operated by company is one speed boat 1 x 40 HP

 

Handling Equipment

3 unit, Forklift Diesel capacity 2 tons

1 unit, Forklift Diesel capacity 3 tons

1 unit, Forklift Diesel capacity 5 tons

1 unit, Luffing Crane capacity 20,6 tons

 

Fresh Water

Available, at pantoloan pier from public water development supply capacity 100 tons/hour

 

 

Bunkering

Available at Loly Pertamina pier, supplied by PERTAMINA depend on request with capacity 175 tons/hour

 

Repair

Not Available

 

Immigration

Repatriation

Possible, dealt with Immigration through Jakarta or Makassar

 

Shore Leave

All crew members allowed ashore on permission of Immigration

 

Identification Card

Needed by Immigration for landing permit

 

Miscellaneous

Medical

Hospital facilities or Port Doctor are available

 

Airport

Mutiara Airport, located 25 from port. Domestic flights are regularly supported Merpati Nusantara Airline, and Bouraq Airline. 2 flights every day from Palu to Jakarta.